THARS Training Center Construction

7/24/2007

Previous page 2 of 2

P1010113 P1010277 P1010447 P1010450
Roofing Putting up the tinsheets Plastering the walls and flooring
P1010699 P1010707 P1010749 P1010752
Connecting to the municipal water system Admiring the work done Terracing in front of the building
P1010753 P1010813 P1020216  
Plywood ceiling makes the building useable Engineers analyze progress Planting a shade tree